Built to ship, install, and stay put.

Loftwall built for facilities. NET 30, Turbo Orders, healthcare-grade cleanable. Products that reconfigure when the floor plan shifts. Made in Dallas.

SOLUTIONS FOR FACILITIES

Loftwall is the vendor that shows up the same way every time. 10-day standard lead times, healthcare-grade cleanable, NET 30 terms when you qualify, and products that reconfigure when the floor plan shifts.

What matters

Noise complaints. Move-add-change. Budget defense.

You spent Tuesday morning fielding noise complaints from the third floor and Tuesday afternoon defending the line item that fixes them. Wednesday is the move-add-change calendar. Loftwall built around how facilities actually buys. Fast standard lead times, durable products, NET 30 terms when you qualify, and an aluminum frame system that reconfigures without reordering.

NOISE COMPLAINTS

Open offices that stay open. Without the volume.

Acoustic baffles for the ceiling. Acoustic panels for the walls. Acoustic dividers for the floor. The Loftwall acoustic line covers every surface that bounces sound, and uses 60% post-consumer recycled PET to do it. Spec it once. Stop the Slack threads about the third floor.

Acoustic Calculator and the acoustic product line

MOVE-ADD-CHANGE

Reconfigure without reordering.

Loftwall products are modular by design. Frames link together. Panels swap inside the same frame. Bases come on casters when you specify. When the floor plan shifts, the products move with it. No new line item, no new install crew, no waiting on lead times you already paid for.

Modular aluminum frame system + Configurator

PROCUREMENT TERMS

NET 30 terms when you qualify.

Buyers who order from Loftwall three or more times in a 12-month window qualify for the NET 30 program. Faster procurement, cleaner cash flow, less hassle around invoice timing. Ask your Loftwall rep about onboarding.

NET 30 Program

WHEN THE DEADLINE MOVES

Turbo Orders compress 10 days into less.

When the rollout date shifts and the line item has to land sooner than the standard 10-day lead, Turbo Orders compress the schedule further. Talk to your rep about which products qualify and what the upcharge looks like.

Turbo Orders

How we work with facilities and operations teams

Featured for facilities

TOCA FC training facility (Glide install)

One open training facility, divided into multiple working zones with Glide — the same playbook that works for office floors with shifting use cases.

Adding to the floor plan?

Talk to your Loftwall rep about volume pricing, NET 30 onboarding, and Turbo Orders. We will get you a quote and a delivery date in the same conversation.

TALK TO YOUR REP

All solutions | Browse products